RIDOT Announces Travel Lane Shift On Route 113

The Rhode Island Department of Transportation is reminding drivers that beginning at 8 p.m. Friday all travel lanes on Route 113 [[ East Avenue ]] will be shifted on to the eastbound side of the bridge where it passes over I-95 and I-295 in Warwick.

One travel lane in each direction will operate while crews use accelerated bridge construction methods to begin demolition and replacement of the westbound side of the bridges.

RIDOT says all ramps and exits will remain open, with the exception of Route 113 East to I-95 North.

The temporary traffic pattern will be in place until mid-summer.

(Photo: RI DOT)


Sponsored Content

Sponsored Content